Kayak Construction

june_16
June 16. Stripping the Hull
july_1
July 1. Stripping below the waterline
july_7
July 7. The keel-strip and external stem
aug_9
Aug. 9. Duck Inlay
aug_11
Aug 11. Glass the external hull
aug_15
Aug 15. Flip it over, and ditch the strongback
aug_18
Aug 18. Stripping the Deck
aug_23
Aug 21. The Cockpit Recess
aug_28
Aug 28. Glass on the deck. Mariner's Compass on the bow. Mohogany end pieces. Birdseye maple ends.
fit_finish
Oct (Showing completed kayak) Fitting out the boat. Flush hatches, stripped bulkheads, Shock cord installation.
launch
Oct 10, 2002. First Lauch